Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74017 REL 9: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Project Number:
Title:
Protect and Restore the Crooked and American River Watersheds
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
74017 REL 9
Contract Title:
2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
75011: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
  • 74017 REL 40: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

This project was originally proposed during the 2007 NPCC/BPA Provincial Review.  Although it did not receive funding during that process, it was recommended for funding as an FCRPS BiOp project.  This comprehensive watershed restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation in the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors are the result of past land management activities, including road construction, logging, and mining.  

The Nez Perce-Clearwater National Forest (NPCNF) has completed several surveys, assessments, and NEPA decision documents.  The first assessment, the South Fork Landscape Assessment, was completed in 1999.  This document provided the baseline conditions for each subwatershed as well as general recommendations for future restoration efforts.  The Crooked/American River Environmental Impact Statement (EIS) evaluated a complex system of watersheds using a multidisciplinary approach.  The final product included a proposed list of specific watershed restoration projects, including the Crooked/American Watershed Restoration project.

This project is a part of the BPA, NPCNF, and Nez Perce Tribe (NPT) Watershed Restoration Partnership.  Since the NPT program’s inception, we have shared project planning and development, costs, and implementation responsibilities.  


Summary of FY 2018 Contract Implementation:
                                                                                                                                                                                                                                              
FY 2018 contract implementation, the third year of the Crooked River Valley Rehabilitation project, will include floodplain reconnection, wetland restoration, and stream channel reconstruction in Crooked River.  Mine tailings will be re-graded and spread to create a floodplain that will be inundated annually.  

Approximately 500 1-gallon native riparian plants, such as alder, will also be planted in Elk Creek.  This will be the third consecutive year of riparian planting on private property along Elk Creek.  Periodic reports will be provided to BPA on the status of the contract, and an annual report on accomplishments will be also be completed.
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
01/31/2019
Current Contract Value:
$742,172
Expenditures:
$742,172

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Jenifer Harris Nez Perce Tribe Yes Contract Manager jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Interested Party arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation Submitted to BPA A: 165. Submit Environmental Compliance Documentation to BPA 01/31/2019 09/28/2018
Floodplain Reconnected B: 52. Crooked River Valley Rehabilitation - Floodplain Restoration 11/16/2018 09/29/2018
Wetlands Restored C: 181. Crooked River Valley Rehabilitation - Wetland Restoration 11/16/2018 09/29/2018
Channel Reconstructed D: 30. Crooked River Valley Rehabilitation - Channel Reconstruction 11/30/2018 09/29/2018
Riparian Vegetation Planted E: 47. Plant Riparian Vegetation on Elk Creek 10/26/2018 09/28/2018
FY 2019 SOW package F: 119. Management, Coordination, and Communication 10/26/2018 12/14/2018
Final FY 2018 annual report attached to this contract G: 132. Submit Annual Report for 2/1/18 - 1/31/19 01/25/2019 01/18/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit Environmental Compliance Documentation to BPA 02/01/2018
B 52 Crooked River Valley Rehabilitation - Floodplain Restoration 03/26/2018
C 181 Crooked River Valley Rehabilitation - Wetland Restoration 03/26/2018
D 30 Crooked River Valley Rehabilitation - Channel Reconstruction 03/26/2018
E 47 Plant Riparian Vegetation on Elk Creek 03/26/2018
F 119 Management, Coordination, and Communication 02/01/2018
G 132 Submit Annual Report for 2/1/18 - 1/31/19 02/01/2018
H 185 Periodic Status Reports for BPA 02/01/2018